| Version 1.9 Build 1488
|
|
Next: User interface and tasking
Up: AIPS++ DEVELOPMENT PLAN: Release 1.6
Previous: Build and code distribution system
- 1.
- GlishTk performance: Continue evaluation of GlishTk performance
factors, including: i) dependence on pipe buffer size; ii) other
short-term optimizations to mitigate dynamic scheduling losses. (DrS, H, 3 wk).
- 2.
- Glish threading: Assess cost of Glish threading. Prototype
threading in parts of the Glish library and determine likely GTk
performance enhancements. (DrS, H, 3 wk).
- 3.
- fail on return: Implement fail on return handling in Glish at
function end-points. (DrS, H, 1 wk).
- 4.
- Defect backlog: Address current defect backlog, including: i)
slider problems; ii) hourglass packing; iii) remaining JIVE reference
counting defects. (DrS, H, 3 wk).
- 5.
- Tab widget: Add the Tab widget. (DrS, H, 2 wk).
Next: User interface and tasking
Up: AIPS++ DEVELOPMENT PLAN: Release 1.6
Previous: Build and code distribution system
  Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc.,
Washington, D.C.
Return to AIPS++ Home Page
2006-08-01