Introduction

Development targets are listed in hierarchical form in a work breakdown structure, given below, which defines all targets in the v2.0 plan. The top-level targets are divided between scientific completeness, usability improvements, operations and management, in line with the release objectives listed above. The high-level targets are divided into sub-targets to achieve an average low-level target granularity of no longer than a few weeks. The list of consortium developers who appear in the plan at any level are listed below; note that individual developers may be available to the project for very different allocations of time, as enumerated in detail in the v2.0 plan below.

Abbr. Developer Affiliation
AL Allan Leigh ATNF
AS Anuj Sarma NCSA
AK Athol Kemball NRAO
BG Bob Garwood NRAO
DMC Dave McConnell ATNF
DG Daniel Goscha NCSA
DK David King NRAO
DM Dave Mehringer NCSA
DrS Darrell Schiebel NRAO
ES Eric Sessoms NRAO
GvD Ger van Diepen ASTRON
GM George Moellenbrock NRAO
JB Jim Braatz NRAO
JN Jan Noordam ASTRON
JM Joe McMullin NRAO
KG Kumar Golap NRAO
MM Malte Marquarding ATNF
MW Mark Wieringa ATNF
OS Oleg Smirnov ASTRON
PC Paulo Cortes NCSA
PT Peter Teuben BIMA
RN Roger Noble NRAL
RP Ray Plante NCSA
SB Sanjay Bhatnagar NRAO
SL Selfa Lucero NRAO
TC Tim Cornwell NRAO
WB Wim Brouw ATNF
WY Wes Young NRAO


next up previous contents
Next: Targets for v2.0 Up: AIPS++ DEVELOPMENT PLAN: Release v2.0 Previous: Release priorities   Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc., Washington, D.C.

Return to AIPS++ Home Page
2006-08-01