Getting Started | Documentation | Glish | Learn More | Programming | Contact Us |
![]() | Version 1.9 Build 1488 |
|
Development targets are listed in hierarchical form in a work breakdown structure, given below, which defines all targets in the v2.0 plan. The top-level targets are divided between scientific completeness, usability improvements, operations and management, in line with the release objectives listed above. The high-level targets are divided into sub-targets to achieve an average low-level target granularity of no longer than a few weeks. The list of consortium developers who appear in the plan at any level are listed below; note that individual developers may be available to the project for very different allocations of time, as enumerated in detail in the v2.0 plan below.
Abbr. | Developer | Affiliation |
AL | Allan Leigh | ATNF |
AS | Anuj Sarma | NCSA |
AK | Athol Kemball | NRAO |
BG | Bob Garwood | NRAO |
DMC | Dave McConnell | ATNF |
DG | Daniel Goscha | NCSA |
DK | David King | NRAO |
DM | Dave Mehringer | NCSA |
DrS | Darrell Schiebel | NRAO |
ES | Eric Sessoms | NRAO |
GvD | Ger van Diepen | ASTRON |
GM | George Moellenbrock | NRAO |
JB | Jim Braatz | NRAO |
JN | Jan Noordam | ASTRON |
JM | Joe McMullin | NRAO |
KG | Kumar Golap | NRAO |
MM | Malte Marquarding | ATNF |
MW | Mark Wieringa | ATNF |
OS | Oleg Smirnov | ASTRON |
PC | Paulo Cortes | NCSA |
PT | Peter Teuben | BIMA |
RN | Roger Noble | NRAL |
RP | Ray Plante | NCSA |
SB | Sanjay Bhatnagar | NRAO |
SL | Selfa Lucero | NRAO |
TC | Tim Cornwell | NRAO |
WB | Wim Brouw | ATNF |
WY | Wes Young | NRAO |