| Version 1.9 Build 1488
|
|
Next: Synthesis
Up: AIPS++ DEVELOPMENT PLAN: Release 1.4
Previous: Introduction
Subsections
- CLI improvement
- Improving the CLI and scripting capabilities
is of direct and immediate benefit to end-users.
- Calibration and imaging capabilities
- The provision of
calibration and imaging capabilities which are integrated with
the synthesis infrastructure is a high priority.
- Support GBT commissioning
- The continued development of tools
required for GBT commissioning remains a priority during this
development cycle.
- Complete dish as a tool
- Complete the decomposition of dish as a
standard AIPS++ tool. (JM, H, 0.5 wk).
- Bulk processing in Glish
- Support bulk processing of data in
Glish using the current dish reduction functions. (JM, H, 0.5
wk).
- Consistent use of flags, weights in averager
- (JM, H, 1 wk).
- SD imaging using imager
- Extend and test the current SD imaging
capabilities in imager. (JM, H, 4 wk).
- MS v2 filler conversion
- Convert sdfits2ms, ms2sdfits,
gbtmsfiller and SDIter to MS v2. Includes feedback from GBT observers
interface to gbtmsfiller. (BG, H, 6 wk).
- Spectrometer backend support
- (BG, H, 1.5 wk).
- IF backend support
- (BG, H, 1.5 wk).
- Initial SD calibration using calibrater
- Initial calibration
examples using a common infrastructure with synthesis. (BG, H, 3
wk).
- GBT commissioning assistance
- Continued part-time assistance of
GBT commissioning; total time listed here. Includes work on tipper
scripts. (JB, H, 4 wk).
- Improve velocity/frequency conversions
- Unify velocity and
frequency conversions in the plotter and in dish. (JB, H, 2
wk).
- Consistent use of flags, weights in dish
- (JB, H, 2 wk).
- Replace sdimager
- (JM, M, 1 wk).
Next: Synthesis
Up: AIPS++ DEVELOPMENT PLAN: Release 1.4
Previous: Introduction
  Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc.,
Washington, D.C.
Return to AIPS++ Home Page
2006-08-01