| Version 1.9 Build 1488
|
|
Next: Synthesis
Up: AIPS++ DEVELOPMENT PLAN: Release 1.5
Previous: Introduction
Subsections
- Support GBT commissioning
- The continued development of tools
required for GBT commissioning remains a high priority during this
development cycle.
- Calibration and imaging capabilities
- The provision of
calibration and imaging capabilities which are integrated with
the synthesis infrastructure is a high priority.
- Responding to user feedback
- This is a high priority as many new
users will be introduced to the single-dish software this development
cycle through GBT commissioning.
- Consistent use of flags, weights throughout dish
- (JM, H, 3 wk).
- SD imaging using imager
- Extend and test the current SD imaging
capabilities in imager. (JM, H, 2 wk, TC, H, 3 wk).
- Spectrometer backend support
- (BG, H, 2 wk).
- IF and LO1 support
- (BG, H, 2 wk).
- Initial SD calibration using calibrater
- Initial calibration
examples using a common infrastructure with synthesis. (JM, H, 3
wk, AK, H, 2 wk).
- GBT commissioning assistance
- Continued assistance in
GBT commissioning; total time listed here. (JB, H, 7 wk, BG, H, 4 wk).
- dish test scripts
- Automated test scripts for dish. (JM, H, 2 wk).
- Improved single-dish documentation
- (BG, H, 2 wk).
- Replace sdimager
- (JM, M, 1 wk).
- Bad pixel replacement
- Replace bad pixels by various means (BG, M, 2wk).
Next: Synthesis
Up: AIPS++ DEVELOPMENT PLAN: Release 1.5
Previous: Introduction
  Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc.,
Washington, D.C.
Return to AIPS++ Home Page
2006-08-01