Getting Started Documentation Glish Learn More Programming Contact Us
Version 1.9 Build 1488
News FAQ
Search Home


next up previous contents
Next: Synthesis Up: AIPS++ DEVELOPMENT PLAN: Release 1.5 Previous: Introduction

Subsections


Single-dish

Priorities

Support GBT commissioning
The continued development of tools required for GBT commissioning remains a high priority during this development cycle.

Calibration and imaging capabilities
The provision of calibration and imaging capabilities which are integrated with the synthesis infrastructure is a high priority.

Responding to user feedback
This is a high priority as many new users will be introduced to the single-dish software this development cycle through GBT commissioning.

Targets

Consistent use of flags, weights throughout dish
(JM, H, 3 wk).

SD imaging using imager
Extend and test the current SD imaging capabilities in imager. (JM, H, 2 wk, TC, H, 3 wk).

Spectrometer backend support
(BG, H, 2 wk).

IF and LO1 support
(BG, H, 2 wk).

Initial SD calibration using calibrater
Initial calibration examples using a common infrastructure with synthesis. (JM, H, 3 wk, AK, H, 2 wk).

GBT commissioning assistance
Continued assistance in GBT commissioning; total time listed here. (JB, H, 7 wk, BG, H, 4 wk).

dish test scripts
Automated test scripts for dish. (JM, H, 2 wk).

Improved single-dish documentation
(BG, H, 2 wk).

Replace sdimager
(JM, M, 1 wk).

Bad pixel replacement
Replace bad pixels by various means (BG, M, 2wk).


next up previous contents
Next: Synthesis Up: AIPS++ DEVELOPMENT PLAN: Release 1.5 Previous: Introduction   Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc., Washington, D.C.

Return to AIPS++ Home Page
2006-08-01