Getting Started | Documentation | Glish | Learn More | Programming | Contact Us |
Version 1.9 Build 1488 |
|
Development targets are listed separately for each major development area in AIPS++. These targets cover only the development cycle through October 2001, and do not include longer-term items, which are tracked separately for consideration in subsequent development cycles (and can be found in docs/project/deferred_1.6.ps.gz). There are 21 weeks in this development cycle, between the week of May 7, 2001 and the expected code-freeze on 1 October 2001, but deductions for defect correction and code review (30%; 1.5 days per week), user support (up to 20%), and where applicable, science time (25%), have been made. The exact numbers vary by developer and institution, and the best estimate has been made in each case. Variability in these estimates is accommodated by the inclusion of medium prioirty targets, which may need to be carried over into the next cycle. Each target is assigned a priority as high (H), which implies that the target is expected to be completed this cycle, and medium (M), which is work to be done on an as-available basis. Note also, that not all developers are available to the project on a full-time basis, and have reduced commitments as a result.
Abbr. | Developer | Affiliation |
AK | Athol Kemball | NRAO |
AS | Anuj Sarma | NCSA |
BG | Bob Garwood | NRAO |
DK | David King | NRAO |
DM | Dave Mehringer | NCSA |
DrS | Darrell Schiebel | NRAO |
GvD | Ger van Diepen | ASTRON |
GM | George Moellenbrock | NRAO |
HR | Harold Ravlin | NCSA |
JB | Jim Braatz | NRAO |
JN | Jan Noordam | ASTRON |
JM | Joe McMullin | NRAO |
KG | Kumar Golap | NRAO |
MM | Malte Marquarding | ATNF |
MW | Mark Wieringa | ATNF |
NK | Neil Killeen | ATNF |
PC | Paulo Cortes | NCSA |
PT | Peter Teuben | BIMA |
RM | Ralph Marson | NRAO |
RP | Ray Plante | NCSA |
OS | Oleg Smirnov | ASTRON |
TC | Tim Cornwell | NRAO |
WB | Wim Brouw | ATNF |
WY | Wes Young | NRAO |