Getting Started Documentation Glish Learn More Programming Contact Us
Version 1.9 Build 1488
News FAQ
Search Home


next up previous contents
Next: Synthesis Up: AIPS++ DEVELOPMENT PLAN: Release 1.6 Previous: Introduction

Single-dish

1.
Complete GBT MS filler: Including: i) complete IF/LO conversion; ii) GBT GO FITS file to MS; iii) Tcal to SYSCAL sub-table; iv) spectrometer and spectral processor backend support; v) track M&C FITS file changes; vi) improve reliability and robustness in on-line mode; vii) complete holography support; viii) document filler internals in preparation for filler transfer to GBT science support. (BG, H, 9 wk).

2.
SD MS audit: Audit the MS produced by the GBT MS filler for scientific completeness. (BG, H, 2 wk, AK, H, 1 wk).

3.
SD calibration: Complete basic SD calibration modes using synthesis infrastructure(JM, H, 6 wk, AK, H, 2 wk).

4.
ssa enhancements: Complete ssa improvements. (JM, H, 2 wk).

5.
IARDS: Interim real-time display system for the GBT (JB, H, 4 wk).

6.
Holography support: Full holography support using synthesis infrastructure. (JB, H, 4 wk).

7.
Document DCR tool: Document DCR tool and heuristics(JB, H, 3 wk).

8.
SD imaging: Including: i) verify single-dish imaging speed for spectral line data; ii) demonstrate combined VLA and GBT imaging. (TC, H, 6 wk).


next up previous contents
Next: Synthesis Up: AIPS++ DEVELOPMENT PLAN: Release 1.6 Previous: Introduction   Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc., Washington, D.C.

Return to AIPS++ Home Page
2006-08-01