| Version 1.9 Build 1488
|
|
Next: Synthesis
Up: AIPS++ DEVELOPMENT PLAN: Release 1.6
Previous: Introduction
- 1.
- Complete GBT MS filler: Including: i) complete IF/LO conversion;
ii) GBT GO FITS file to MS; iii) Tcal to SYSCAL sub-table; iv)
spectrometer and spectral processor backend support; v) track M&C FITS
file changes; vi) improve reliability and robustness in on-line mode;
vii) complete holography support; viii) document filler internals in
preparation for filler transfer to GBT science support. (BG, H, 9
wk).
- 2.
- SD MS audit: Audit the MS produced by the GBT MS filler for
scientific completeness. (BG, H, 2 wk, AK, H, 1 wk).
- 3.
- SD calibration: Complete basic SD calibration modes using
synthesis infrastructure(JM, H, 6 wk, AK, H, 2 wk).
- 4.
- ssa enhancements: Complete ssa improvements. (JM, H, 2 wk).
- 5.
- IARDS: Interim real-time display system for the GBT (JB, H, 4 wk).
- 6.
- Holography support: Full holography support using synthesis
infrastructure. (JB, H, 4 wk).
- 7.
- Document DCR tool: Document DCR tool and heuristics(JB, H, 3 wk).
- 8.
- SD imaging: Including: i) verify single-dish imaging speed for
spectral line data; ii) demonstrate combined VLA and GBT
imaging. (TC, H, 6 wk).
Next: Synthesis
Up: AIPS++ DEVELOPMENT PLAN: Release 1.6
Previous: Introduction
  Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc.,
Washington, D.C.
Return to AIPS++ Home Page
2006-08-01