| Version 1.9 Build 1488
|
|
Next: Applications integration
Up: AIPS++ DEVELOPMENT PLAN: Release 1.6
Previous: Synthesis
- 1.
- Editing of Getting Results: Includes: i) edit existing and new
GR chapters to conform to a common framework; ii) identify missing
areas in GR; iii) incorporate user group feedback in the editing
process. (NK, H, 4 wk).
- 2.
- Single-dish documentation editing: Improve the existing SD
documentation and add new material (JM, H, 2 wk).
- 3.
- ATCA Getting Results chapter: Getting Results chapter for ATCA
continuum, continuum polarimetry and spectral line reduction
modes. (MW, H, 2 wk).
- 4.
- BIMA Getting Results chapter: Getting Results chapter for BIMA
continuum, continuum polarimetry and spectral line reduction
modes. (AS, H, 2 wk).
- 5.
- VLA Getting Results chapter: Edit and extend the existing VLA
Getting Results chapter to cover spectral line, and improve existing
material. (GM, H, 2 wk).
- 6.
- Recipes: Revitalize the existing recipes repository. Change the
format as required, and add new recipes in all areas. (GM, H, 3
wk).
Next: Applications integration
Up: AIPS++ DEVELOPMENT PLAN: Release 1.6
Previous: Synthesis
  Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc.,
Washington, D.C.
Return to AIPS++ Home Page
2006-08-01