Getting Started Documentation Glish Learn More Programming Contact Us
Version 1.9 Build 1488
News FAQ
Search Home


next up previous contents
Next: Images Up: AIPS++ DEVELOPMENT PLAN: Release 1.5 Previous: User interface and tasking

Subsections


Basic library

Priorities

Consolidation
The basic library, which covers all fundamental infrastructure, is mostly complete. Development in this cycle has been scheduled in the area of library maintenance, and in the provision of limited new capabilities required for application development.

Targets

Large-file support in Tables
Add large-file support in the Table system. Includes evaluation of trial LFS available for Linux (GvD, H, 3 wk).

Sub-table locking options
Add expanded sub-table locking options (GvD, H, 0.5 wk).

Arrays in TaQL
Support arrays in all TaQL functions (GvD, H, 1 wk).

Column removal in TSM
Allow column removal in TSM (GvD, H, 1 wk).

Deep copy and actualDesc()
Provide additional information on the storage manager in use and the actual table description; allow deep copy of tables. (GvD, H, 1 wk).

Time comparison function in TaQL
Add a time comparison function to TaQL, to specifications provided by synthesis. GvD, H, 1 wk).

Exception-handling clean-up
Remove CanDelete and Cleanup from the library (DS, H, 0.25 wk).

File descriptor limit
Change aipsinit scripts to set ulimit/limit on maximum number of file descriptors appropriately (DS, H, 0.25 wk).

complex, string, and iostream
Move to standard library compliance in these areas. Build stability to be maintained in this process. (WB, H, 2 wk).

Measures and Quanta
i) tests of baseline, antenna positions and uvw calculations; ii) arrays of measures in Glish; and, iii) quanta improvements per defects and release testing. (WB, H, 4 wk).

Fitting
i) Image-fitting support; ii) requirements document for component model changes for uv-fitting. (WB, H, 3 wk).

Measures chapter for Getting Results
Chapter in Getting Results describing end-user Glish use of Measures. (RP, M, 2 wk).


next up previous contents
Next: Images Up: AIPS++ DEVELOPMENT PLAN: Release 1.5 Previous: User interface and tasking   Contents
Please send questions or comments about AIPS++ to aips2-request@nrao.edu.
Copyright © 1995-2000 Associated Universities Inc., Washington, D.C.

Return to AIPS++ Home Page
2006-08-01